PROPOSED PROJECTS

On November 3, 2026, Parchment School District voters will consider a $41 million bond proposal.

 

The proposed plan consolidates the district's footprint by closing the middle school and transitioning to dedicated grade-level centers with age-appropriate learning environments.

 

If approved, funds will transition Northwood to a K–2 building, expand North Elementary to a 3–6 configuration, and construct a new, separate 7th- and 8th-grade wing at the high school.

 

This proposal represents an expected
3.95 mill tax increase over the current levy.

A full list of proposed projects can be found below.

Parchment School District 9.8.26-25.jpg

STUDENT OPPORTUNITIES

OPERATIONS + EFFICIENCY

3.png

Key 2026 Bond Elements

5.png
8.png
7.png
6.png

Streamlined Spending Through Consolidation

Rather than continuing to spend funds on the aging Middle School facility, the district is proactively choosing to sell or demolish the building. This will eliminate unnecessary operational overhead and redirect those resources directly into the remaining facilities. A new Junior High wing will be added to Parchment High School for 7th and 8th grade students.

Dedicated Elementary Centers

The bond proposes transitioning Northwood Elementary to a dedicated K-2 building and expanding North Elementary into a 3-6 intermediate school. This will allow teachers to collaborate across each grade level and create age-specific learning environments. Each school will receive new spaces, including a new competition gym at North Elementary.

Modern 7/8 Junior High

The bond proposes moving 7th- and 8th-graders into a brand-new wing at Parchment High School. The new wing will feature a dedicated entrance, new classrooms, a science lab, multipurpose spaces, cafeteria, and additional support spaces.

Lower Operating Costs

Remaining bond funds will be used across the district to support long-term efficiency in district facilities. This includes roofing repairs, playground upgrades, building access controls, boiler and electrical systems. A full list of proposed projects at each school can be found below.  

Grade K-2 School 

​​

(Current Northwood Elementary)

PROJECT COST: $8,058,909

Transform the existing Northwood Elementary into a dedicated grade K-2 school. ​​

  • New addition to house gymnasium, storage, and restrooms

  • Roofing replacement in select areas

  • Boiler replacement

  • Electrical service upgrade

  • Increase parking capacity with new asphalt parking lot

  • Playground upgrades

  • New classroom furniture and technology

Grade 3-6 School

(Current North Elementary)

PROJECT COST: $17,447,025

Transform the existing North Elementary into a dedicated grade 3-6 school.

  • New addition to house gymnasium and storage

  • New addition to house new classrooms, academic support spaces, and student restrooms

  • Security upgrades including secure vestibule entrance

  • Boiler replacement

  • Electrical service upgrade

  • Increase parking capacity with new asphalt parking lot

  • Playground upgrades

  • New classroom furniture and technology

Parchment Jr./High School​

PROJECT COST: $14,615,611

Adding a separate wing for grades 7-8 students. 

  • New cafeteria/
    multipurpose addition

  • New addition to house classrooms, science lab, academic support spaces and student restrooms

  • Boiler replacement

  • Electrical service upgrade

  • New classroom furniture and technology

 

Early Learning Center

 

(Current Central Elementary)

PROJECT COST: $306,801

 

Transform the existing Central Elementary into the new Parchment Early Learning Center (PELC) and administration offices.

  • New furniture and classroom technology

  • Fire alarm system replacement

Parchment Middle School

SELL or DEMOLISH 

The Parchment Middle School is one of our district's most expensive buildings to maintain and under the proposed plan, it would no longer be necessary. Instead, the November bond proposal would include a brand-new junior high wing at our high school for our 7th and 8th graders.

 

The district will have two choices for the existing middle school building: sell it or demolish it. The projected cost for demolition and site restoration is $420,949. If approved, this cost would be covered as part of the 2026 Bond Proposal. Any proceeds from the sale of the Middle School would be used to address facility needs in other buildings. 

Parchment Schools_New HS Addition_Low Opacity Context.jpg

Proposed New

Junior High Wing

A conceptual rendering of a new wing on Parchment High School for 7th and 8th grade students. 

Proposed New

Junior High Cafeteria

A conceptual rendering of a proposed new cafeteria for junior high students at Parchment High School.

New MS Cafe-small.png

Proposed New

Elementary Gymnasium

A conceptual rendering of a proposed new gymnasium for North + Northwood
Elementary Schools

ELECTION DAY 

NOVEMBER 3, 2026

Parchment School District

520 N. Orient Street

Kalamazoo, MI 49004

Phone: (269) 488-1050

www.parchmentschools.org

Paid for by Parchment School District.